Read
As the design-build architect, Studio GC worked with the City of Berwyn on an addition to Fire Station 2 that exceeded the challenges of a tight site and stormwater needs. The addition seamlessly fit into the design of the existing building while on a strict budget. This garage and maintenance facility will allow the City to expand internal maintenance services for the foreseeable future.
Look